# A diversified European pipeline combining near-term capacity with significant expansion potential

> Selected Qore Infrastructure Partners facilities: an operating Swiss campus, a transmission-connected German hyperscale campus and a zoned German greenfield campus, with further pipeline in the UK, Switzerland and the Nordics. More than 1 GW of power-secured pipeline.

URL: https://www.qoreinfra.com/platform/facilities/
Publisher: Qore Infrastructure Partners (https://www.qoreinfra.com)

---

Facilities and pipeline

About 640 MW of secured grid capacity across three near-term facilities, and more than 1 GW of power-secured pipeline in total.

1 GW+Power-secured development pipeline across Europe

~640 MWSecured grid capacity across three near-term facilities

2027First new capacity, with further phases through 2030

100%Pre-lease model for hyperscale, neocloud and AI tenants

Pipeline includes near-term actionable facilities, longer-term pipeline and identified expansion capacity at existing facilities. Facility names, locations and counterparties are confidential and shared with qualified counterparties under NDA.

Near-term facilities

## Three facilities with secured grid capacity

An operating campus, transmission-level development and zoned greenfield capacity, with first new capacity from 2027.

Switzerland

### Operating digital infrastructure campus

An established campus with live grid capacity and existing infrastructure, expanded through modular retrofit and new-build phases without zoning or permitting risk.

Status
:   Operating

Grid
:   Live, expansion confirmed

New capacity
:   From 2027

Delivery
:   Modular, fully fitted

Germany

### Transmission-connected hyperscale campus

A multi-phase campus connecting directly at transmission level to an existing extra-high-voltage substation, avoiding the distribution-grid queue.

Status
:   Development

Grid
:   Transmission level

First capacity
:   2028

Delivery
:   Fully fitted

Germany

### Zoned greenfield campus

A greenfield campus zoned for data centre use, with its grid connection agreement agreed and a phased capacity ramp for hyperscale and frontier AI tenants.

Status
:   Development

Zoning
:   In place

First shell handover
:   2028

Delivery
:   Powered shell or fully fitted

Pipeline

## Selected pipeline providing runway for follow-on capacity

Each pipeline facility is assessed against the same rules: confirmed or secured power, zoned or near-zoned land, and power-on by 2027 to 2028.

United Kingdom

Large-scale campus with on-site generation and a phased path to hyperscale capacity; first capacity 2028.

Switzerland

Greenfield facility with direct renewable supply and modular delivery; first capacity 2027.

Nordics

Two greenfield campuses with secured power, designed fully fitted for AI training and inference; first capacity 2027 to 2028.

Further European markets

Selected opportunities assessed against the platform's power-first criteria.

## Qualified counterparties can request facility-level information under NDA.

[Request information](mailto:contact@qoreinfra.com?subject=Facility%20information%20request)

---

About the publisher: Qore Infrastructure Partners (QIP) is Europe's power-ready hyperscale and AI data centre platform, headquartered in Zug, Switzerland: Building Europe's Sovereign AI Infrastructure. Website: https://www.qoreinfra.com. Not affiliated with Gcore, QORE Switzerland AG, QORE Global, QORE Finance or Qore (core banking). Nothing on this site is an offer of securities or investment advice.