Aerial view of a hyperscale data centre campus
Facilities and pipeline

A diversified European pipeline combining near-term capacity with significant expansion potential

About 640 MW of secured grid capacity across three near-term facilities, and more than 1 GW of power-secured pipeline in total.

Illustrative image
1 GW+Power-secured development pipeline across Europe
~640 MWSecured grid capacity across three near-term facilities
2027First new capacity, with further phases through 2030
100%Pre-lease model for hyperscale, neocloud and AI tenants

Pipeline includes near-term actionable facilities, longer-term pipeline and identified expansion capacity at existing facilities. Facility names, locations and counterparties are confidential and shared with qualified counterparties under NDA.

Near-term facilities

Three facilities with secured grid capacity

An operating campus, transmission-level development and zoned greenfield capacity, with first new capacity from 2027.

Swiss alpine landscape
Switzerland

Operating digital infrastructure campus

An established campus with live grid capacity and existing infrastructure, expanded through modular retrofit and new-build phases without zoning or permitting risk.

Status
Operating
Grid
Live, expansion confirmed
New capacity
From 2027
Delivery
Modular, fully fitted
Aerial view of a hyperscale data centre campus
Germany

Transmission-connected hyperscale campus

A multi-phase campus connecting directly at transmission level to an existing extra-high-voltage substation, avoiding the distribution-grid queue.

Status
Development
Grid
Transmission level
First capacity
2028
Delivery
Fully fitted
Aerial view of zoned greenfield land beside a motorway
Germany

Zoned greenfield campus

A greenfield campus zoned for data centre use, with its grid connection agreement agreed and a phased capacity ramp for hyperscale and frontier AI tenants.

Status
Development
Zoning
In place
First shell handover
2028
Delivery
Powered shell or fully fitted
Pipeline

Selected pipeline providing runway for follow-on capacity

Each pipeline facility is assessed against the same rules: confirmed or secured power, zoned or near-zoned land, and power-on by 2027 to 2028.

United Kingdom

Large-scale campus with on-site generation and a phased path to hyperscale capacity; first capacity 2028.

Switzerland

Greenfield facility with direct renewable supply and modular delivery; first capacity 2027.

Nordics

Two greenfield campuses with secured power, designed fully fitted for AI training and inference; first capacity 2027 to 2028.

Further European markets

Selected opportunities assessed against the platform's power-first criteria.

Qualified counterparties can request facility-level information under NDA.