Aerial view of a hyperscale data centre campus
Engage

Capacity for hyperscalers, frontier AI labs and neoclouds

Capacity on dates a cluster roadmap can rely on, at facilities where power is already confirmed.

Illustrative image

Confirmed power

Grid capacity confirmed in writing by the system operator, with power-on from 2027 to 2028 and a documented ramp.

Your design, or ours

Powered shell for your reference design, or build-to-suit and fully fitted white space, conventional or Qore Modular.

Density headroom

Liquid cooling and power trains designed for racks above 100 kW and the next generations of accelerators.

Process

How an engagement works

  1. Requirement

    Capacity, ramp, geography, density and delivery model, shared under NDA.

  2. Match

    Matching to facilities with confirmed power, with indicative programmes.

  3. Terms

    Heads of terms and joint design lock.

  4. Delivery

    Delivery, commissioning and, if required, operation.