
Engage
Capacity for hyperscalers, frontier AI labs and neoclouds
Capacity on dates a cluster roadmap can rely on, at facilities where power is already confirmed.
Confirmed power
Grid capacity confirmed in writing by the system operator, with power-on from 2027 to 2028 and a documented ramp.
Your design, or ours
Powered shell for your reference design, or build-to-suit and fully fitted white space, conventional or Qore Modular.
Density headroom
Liquid cooling and power trains designed for racks above 100 kW and the next generations of accelerators.
Process
How an engagement works
Requirement
Capacity, ramp, geography, density and delivery model, shared under NDA.
Match
Matching to facilities with confirmed power, with indicative programmes.
Terms
Heads of terms and joint design lock.
Delivery
Delivery, commissioning and, if required, operation.

