Aerial view of zoned greenfield land beside a motorway
Engage

For landowners, utilities and power producers

Land with power, or power seeking a long-term offtaker. The platform acquires, develops and partners.

Illustrative image
Criteria

What the platform looks for

Land able to carry tens to hundreds of megawatts, with power on in 2027 to 2028.

Power

An existing connection, a confirmed connection offer, proximity to a high-voltage substation with spare capacity, or adjacent generation.

Planning

Zoning that permits data centre use, or a planning process in its final stage.

Land

Typically several hectares or more, with road access, fibre routes and ideally a nearby heat network.

Structures

Ways to work together

Acquisition

Qore acquires the land, with payments that can be staged to power milestones.

Joint venture

The partner contributes land, power or grid capacity; Qore develops, delivers and operates. The platform already works this way with power producers in Germany.

Long-term offtake

For power producers, a facility on or beside generation as a long-term, high-value customer.

All information is treated as confidential. A mutual NDA can be signed before details are exchanged.